Copyright © 2003 - 2017 Irish Association of Self Builders


Share on Facebook Share on Twitter Share via e-mail Print Share on Google Bookmarks

Iaosb.Com

Ireland’s Number One Website For Building A House

Building Stages Building  Materials Household Appliances Landscape & Gardening Information Video's
Legal & Finance Design & Planning Schedule & Cost Health & Safety Renewable Energy Water Supply Heating & Insulation
Home Waste Management Problems & Solutions Tools & Machinery Contact Us Advertise

Irish Association Of Self Builders                                         The Representative Body for Self Builders of Ireland

Directory

1- Finding A Site 2- Ground Condition 3- Designing Your Home 4- Planning Permission 5- Finding Contractors 6- Site Clearance 7- Foundations
8- Base Structure 9- Drains & Pipes 10- DPC & Radon 11- Ground Floor 12- Wall Structure 13- Cills & Lintels 14- Second Floor
15- Roof Structure 16- Chasing 17- Doors & Windows 18- External Wall Finishes 19- First Fixes 20- Interior Joinery 21- Interior Plastering
22- Second Fixes 23- Snag List 24- Decorating 25- Moving Water Connection ESB Connection Eircom Connection

Chasing


Before any of the first fixes are done, you need to make sure that all the chasing in the building have been done for all your electric wires and plumbing pipes.


This is one part of the project that many people who know a bit about DIY and have a hammer and chisel try to tackle themselves, thinking that they can save a few Euros on the project. But in most cases as soon as they start, they wish they had never attempted to do it in the first place.


Chasing should be left to the professional who have proper equipment to do the chasing and know the proper ventilation process in order not to suffocate themselves.


If you value your health and lungs, do not attempt this yourself, or at least make sure that you have proper respiratory equipment.


This is another part of the project that you need to plan properly as it can not be changed later on without causing damage to the finishes and creating more problems.


You need to decide exactly where you want all your light switches, sockets, wall lights, plumbing pipes, phone lines, computer networking, tv/satelite and any other wire or pipe that has to go into the walls. And do not forget the security lights for the outside walls.






You need to decide on how high or how low you wish the access points be to them and before the chasers arrive you need to make sure that you mark all the locations clearly where you want them to be placed. Do not leave this decision to the electrician, plumber or the chaser as everyone has a different idea on their placing.


When you are making the decision on the position of these access points, do take into consideration about the reach of the children or people who are handicapped and would have difficulties with certain heights.

Self Build Direct is the leading insurance policy offering protection to individuals building or extending their homes.

Our cover leads the market and has been developed after assisting 1,000's of self builders over the last 20 years.

Arachas Corporate Brokers Limited trading as Arachas is regulated by the Central Bank of Ireland

Self Build Insurance

Full Employers
Public Liability and All
Risks cover for New Builds,
Extensions and Renovations
 
Cover can be taken at
any stage of the project
Very competitive premiums.

Phone 01 897 01 05

www.fingalinsurance.ie


Fingal Insurance Group DAC is Regulated by The Central Bank of Ireland