Copyright © 2003 - 2017 Irish Association of Self Builders


Share on Facebook Share on Twitter Share via e-mail Print Share on Google Bookmarks

Iaosb.Com

Ireland’s Number One Website For Building A House

Building Stages Building  Materials Household Appliances Landscape & Gardening Information Video's
Legal & Finance Design & Planning Schedule & Cost Health & Safety Renewable Energy Water Supply Heating & Insulation
Home Waste Management Problems & Solutions Tools & Machinery Contact Us Advertise

Irish Association Of Self Builders                                         The Representative Body for Self Builders of Ireland

Directory

1- Finding A Site 2- Ground Condition 3- Designing Your Home 4- Planning Permission 5- Finding Contractors 6- Site Clearance 7- Foundations
8- Base Structure 9- Drains & Pipes 10- DPC & Radon 11- Ground Floor 12- Wall Structure 13- Cills & Lintels 14- Second Floor
15- Roof Structure 16- Chasing 17- Doors & Windows 18- External Wall Finishes 19- First Fixes 20- Interior Joinery 21- Interior Plastering
22- Second Fixes 23- Snag List 24- Decorating 25- Moving Water Connection ESB Connection Eircom Connection

Specification for Standard Non-Scheme Domestic Underground Service to an Outdoor Meter Cabinet (low-voltage service not exceeding 50m) from an Overhead Network


The Customer must ensure that:



Notes:

It is essential that the ESB cable does not come into contact with the cavity insulation. Allow a projection of 25mm of the hockey stick into the base of the cabinet.

There must be a minimum clearance of 100mm between the service duct and other services on the house-holder’s property.

ESB will provide black UV light-resistant ducting from below the finished ground level to the top of the service pole.

For poles more than 50m away from the cabinet, 125mm red ESB approved ducting shall be used with an ESB approved service vault at the junction of the duct and the hockey stick.


Connection will only be made after all above requirements are meet.


Red ESB approved 50mm Solid wall MDPE duct @ 600mm min. depth below (F.G.L.)

ESB yellow warning tape at max. depth of 300mm below finished ground level (F.G.L.)


Duct end sealed with plastic wrapped adhesive tape


Location


Installation


To get further details, please click on the following link:
http://www.esb.ie/esbnetworks/en/downloads/metering_specification_rev_9.pdf


ESB Meter Box Installation

The following information is from ESB website : www.esb.ie


ESB Meter Box Night/Day Electricity Existing Poles and Lines Relocating The Meter Box